News

Frequently asked questions?

Frequently asked questions?  

One of the most common questions we receive is, "Do you have a headwall to suit twin pipes?" All of our precast concrete headwalls can accommodate multiple openings, which can be configured side by side, one above the other, or in the back wall and wing walls.

For more frequently asked questions, please visit our website

Date Posted: March 16, 2026, 8:33 a.m.
New Mitred Headwall Range

New Mitred Headwall Range 

Althon mitred headwalls for pipework up to and including 600mm are fibre reinforced precast concrete open inlets allowing surface water runoff to enter SUDS features, or to act as an outlet or overflow. The profile of the inlet 1:3 (18 Degrees) is the same as the surrounding ground in accordance with guidelines for the construction and adoption of swales and ponds. There is a recess formed in either side to key the unit into the slope of the swale or pond and prevent it slipping.


We can provide our mitred headwalls with stainless steel or galvanised steel straight bar gratings. A top & bottom bracket locate the grating bars, and they are locked into position with a locking bar at the top. The bars are able to be removed individually for ease of maintenance. The grating is located in an 80mm deep recess in the face of the unit to protect it from damage during routine maintenance i.e. mowing.

We are also able to factory fit inline non – return valves such as WaStop valves to our Mitred Headwalls. For more information visit Mitred Headwalls

Date Posted: March 3, 2026, 8:20 a.m.
Merry Chritmas and Happy New Year

Merry Christmas & Happy New Year 

Merry Christmas & Happy New Year to everyone from Althon 

We hope you all have a restful break and we wish you best wishes for 2026 ðŸŽ… 

Date Posted: Dec. 19, 2025, 8 a.m.
Norwich Foodbank Collection

Norwich Foodbank Collection

Althon and the MAG Group are collecting for the Norwich Foodbank Christmas collection this year. If you are local to us and would like to donate you are welcome to drop by with any donations before Friday 12th December. Our address is MAG Group Building, Vulcan Road South, Norwich, NR6 6AF and drop off times would be between 9am – 4.30pm Monday to Friday.

If you would like any more information on what can be donated or on the help that the Norwich Foodbank does you can visit their website https://norwich.foodbank.org.uk/

Date Posted: Nov. 27, 2025, 9:30 a.m.
Low Carbon Concrete Headwalls

Low Carbon Concrete Headwalls

Althon headwalls are manufactured with Eco1® which replaces a significant portion of cement with supplementary cementitious materials (SCMs) like GGBS

ECO 1 Low-Carbon Precast ECO 1: Matches or exceeds traditional performance.

ECO 1 retains CEM I standards while reducing cement content by 46% achieving over 75 N/mm² at 28 days.

It’s fully compliant with BS 8500-2:2023, including Design Chemical Class 4 and Design Sulphate Class 4 making it suitable for even the most aggressive environments

Date Posted: Nov. 26, 2025, 8:30 a.m.