News

Launch of Concrete Slot Drainage Channel Range

Launch of Concrete Slot Drainage Channel Range

Althon have launched a range of heavy duty concrete slotted drainage channels.

These drainage channels are ideally suited for drainage large areas of hardstanding subject to heavy loadings, such as at airports, docks and industrial units.

Please contact our sales team on 01603 488700 or sales@althon.co.uk for more information or

Date Posted: May 13, 2016, 5:58 p.m.
Launch of Steel Slot Drain

Launch of Steel Slot Drain

Althon have launched a range of discreet stainless steel or galvanised steel slot drains. 

The steel slot drainage channels are ideally suited for use in patio and tiled areas, in front of sliding doors and are an excellent solution for discreetly draining pedestrianised public spaces. 

Please contact our sales team on 01603 488700 or sales@althon.co.uk for more information or

Date Posted: May 13, 2016, 5:38 p.m.
Bespoke Headwall with Baffle Blocks

Bespoke Headwall with Baffle Blocks

Althon designed and manufactured a bespoke precast headwall with 84 baffle blocks to the sloping spillway for a project in Scotland.

Please contact our sales team for more information about our bespoke precast products.

Date Posted: May 6, 2016, 12:50 p.m.
German Embassy, London

German Embassy, London

Althon have recently supplied 85 metres of a bespoke stainless steel slot drain to the German Embassy in London.

We manufactured a bespoke stainless steel drainage channel with perforations to one side of the channel body. This was supplied with a stainless steel mesh grating suitable for pedestrian use.

We were charged with designing a drainage channel suitable for use in a terraced area. This meant the channel had to be extremely shallow but still effective at dealing with the surface water run – off.

Date Posted: Sept. 10, 2015, 10:53 a.m.
Eel Pass Headwall

Eel Pass Headwall

Althon have designed and produced a special eel pass precast concrete headwall for an environmentally sensitive scheme.

We produced two headwalls and delivered them to the Contractor in just three weeks. The headwalls were lifted off the delivery vehicle and immediately installed.

Date Posted: Sept. 10, 2015, 10:32 a.m.